New MCAA member Mdm Scaffolding Services, Inc. (Mdm) recently completed installation and removal of 650 LF of frame scaffolding, five (5) levels high, planked every level for trade work at Richardson, Texas Methodist Hospital.Mdm utilized their patented NexGenPlank (16ft — 2 x10’s) that were safer (no splinters, minimal inspection), lighter (48lbs/ft vs 70lbs +/ft), stronger (75PSF w/ 4;1 safety factor) and increased productivity in the process.