Spider, a division of SafeWorks, recently offered a custom, suspended scaffolding solution for tuck-pointing and brick repair work on the 125-foot-tall chimney stack at Lane Tech High School in Chicago.IWG Inc. was familiar with Spider’s specialization in suspended applications. The company turned to Spider for a custom solution. Spider designed, built and installed a rigging star equipped with three swing stages and two Beta Max Gemini material hoists. The rigging star was lifted into place by a crane and then counterweighted, eliminating the need for anchoring into the structure.Additionally, Spider offered all rigging services as well as on-site user training to ensure the safe operation of the equipment.“We were genuinely impressed with Spider’s capabilities through every phase of this project, from the initial design to the on-site supervision,” says Al Arreguin, owner and operator with IWG Inc. “Their Chicago team did a fantastic job meeting our challenges while keeping us safe, on schedule, and within our budget.”About: Tools