/Public/News/20090707082000-1.jpg" width="530" height="298" border="0" alt="Extending the Vanderbilt Hospital at its tightly fit location in downtown Nashville was a daunting task.">
Extending the Vanderbilt Hospital at its tightly fit location in downtown Nashville was a daunting task.
/Public/News/20090707082000-2.jpg" width="300" height="200" border="0" alt="Structures were set in place to support the mast climber units.">
Structures were set in place to support the mast climber units.
"In addition, these units can be built by hand, because the mast sections are light enough to be handled into position," he continues. "They run on electrical power, which was vital because of the problem of noise pollution around the tight city center hospital. After we had designed the support system, which comprised two W14 I-beams positioned on top of a W6 I-beam stack, we worked with our local engineer, Kurt Heinrichs of TEC Services in Lawrenceville, Ga., to verify the integrity of the structure and help design a shoring plan that would effectively negate any load transference onto the floorslab."